Migration & hybrid cloud
without the big bang

Most of our projects start with systems that already exist. We analyse the applications, design the hybrid target architecture and move workloads in waves: to a hyperscaler, to a private cloud, or from one platform to another.

Paths
On-premises to cloud · platform to platform
Target
Hybrid across hyperscalers and private cloud
Method
Waves with cut-over and rollback plans

What we do

Four things
every migration needs

Application assessment

What each application needs, what has to change and in which order — worked out together with the teams that own it.

Hybrid target architecture

Identity, network and data paths designed across clouds and data centres, so the environments behave like one.

Migration in waves

A pilot first, then wave after wave, each with a cut-over plan, a rollback plan and a clear owner.

Modernise along the way

Containers, automated deployment and infrastructure as code are introduced while moving, not in a second project.

Paths we know well

From where you are
to where it makes sense

To the public cloud

  • On-premises applications to Azure, AWS or Google Cloud
  • Containerised workloads onto AKS, GKE or EKS
  • Cloud data platforms such as BigQuery and Snowflake integrated
  • Budget planning for cloud operations from the start

To a private cloud

  • From VMware to Nutanix or Proxmox
  • Virtual machines onto KVM clusters with Ceph storage
  • Workloads onto Kubernetes and OpenShift
  • Or straight into our managed private cloud

Across both

  • Hybrid architectures with private connectivity
  • One identity and access model across platforms
  • One delivery pipeline for every environment
  • Environments and tenants cleanly separated

Hybrid by design

Two clouds and a data centre
working as one

We have planned and built hybrid architectures across Azure and AWS, across Google Cloud and Azure, and across hyperscalers and private cloud. The pattern is always the same: shared identity, private connectivity and one way of deploying.

  • Hybrid target architecture with documented decisions
  • Terraform modules and Helm charts for repeatable environments
  • Role-based access, encryption and WAF rules from day one
  • Redundancy and failover planned across environments

How a migration runs

Four stages
no surprises on cut-over day

1 · Analyse

Applications and dependencies

Inventory, dependencies, data flows and risks, captured in two to four weeks.

2 · Design

Target and path

Target architecture, landing zone and the order in which workloads move.

3 · Pilot

Prove it with one workload

One representative application goes first, so the method is tested before it scales.

4 · Move

Wave by wave

Rehearsed cut-overs with rollback, followed by handover into operations.